Your apartment

Renovations and approvals

How Victorian Model Rules 4.3, 5.2 and 5.3 divide renovations, why there is no statutory 3-month deadline, building permits over $10,000, and our free approval kit.

4 min read · Last checked

Unlike New South Wales, Victoria does not sort renovations into "cosmetic, minor and major" tiers with a 3-month deemed-approval clock. In Victoria, whether you need approval depends on what your work touches — inside your lot, the outside look of your lot, or common property — under the and Schedule 2 of the .

Check what your renovation needs

Use the triage tool below to see which rule applies and who decides (always check your building's registered custom rules too, because they override the Model Rules wherever they cover the same topic):

Interactive Victorian Renovation Checker

Does your Victorian renovation need OC approval?

Split-system AC outdoor unit, awning or new external window

Model Rule 5.2 (External appearance) & Rule 4.3 (Common property)

Written OC approval required. Under Model Rule 5.2, the OC cannot unreasonably refuse external appearance changes.

Note: Matching security doors/insect screens don't need approval under Model Rule 4.3(4).

Based on the Owners Corporations Act 2006 and Schedule 2 Model Rules. Always check your scheme's registered rules first.

The five approval buckets

What the work touchesApproval requiredLegal source
Only inside your lot (paint, carpet, like-for-like kitchen cupboards)Usually no approval. Notify the OC if it may affect common property or needs a building/planning permit.Model Rule 5.3 ()
External appearance of your lot (blinds, split-system outdoor unit, security door, windows)Written OC approval. The OC cannot unreasonably withhold approval, though it may set reasonable conditions. (Matching locks, safety devices and insect screens need no approval under Model Rule 4.3(4).)Model Rule 5.2
Altering common property (slab, shared walls, pipes, waterproofing over common floor, facade, roof)Written OC approval before starting. A lot owner must not alter common property unless expressly authorised.Model Rule 4.3 &
Lease/licence or significant alteration to common propertySpecial resolution (75% of all lots, or 29-day interim under ) &
Incorporating common property into your lot (e.g. enclosing a common-property balcony)Unanimous resolution (100% of all lots) plus a plan of subdivision change &

For sustainability items such as solar panels or solar hot water on the exterior of a lot, prevents rules from unreasonably banning them — and a ban based purely on appearance is legally unreasonable.

Who decides — and why there is no automatic deadline

For most written approvals (Model Rules 4.3 and 5.2), the committee can decide under its general delegation in (unless there is no committee, or the work requires a special or unanimous resolution at a general meeting).

Watch the timing: Neither the Act nor the Model Rules set a statutory deadline for the OC to answer a renovation request, and there is no deemed approval if the committee ignores your email. Put a clear, complete application pack together (scope, plans, builder registration, public liability insurance, dates and working hours) and request a written response by a reasonable date. If the committee stalls or unreasonably refuses, use the Model Rule 7 internal grievance process (parties must meet within 28 days) and, if needed, apply to VCAT under and .

Building rules that run alongside OC approval

OC approval does not replace Victorian building law:

  • Over $10,000: Your builder must use a major domestic building contract and generally be registered with the Building and Plumbing Commission (BPC) (which replaced the VBA). See Consumer Affairs Victoria's checklist for renovations over $10,000.
  • Domestic Building Insurance (DBI): Required above the statutory threshold ($16,000 in current Consumer Affairs Victoria guidance — check before signing).
  • Building permits: Structural changes (such as removing a load-bearing wall) require a building permit from a building surveyor.

Ready to apply? Use our free Victorian Owners Corporation Renovation Approval Kit for copy-and-paste application letters, a document checklist, neighbour notice and follow-up templates.

Check your understanding

1. If a Victorian committee ignores your renovation application for 90 days, is it automatically approved?

2. You want to install an insect screen on your balcony door that matches the building's existing colour, style and materials. Do you need OC approval under the Model Rules?

3. Which rule says a Victorian OC cannot unreasonably withhold approval for changes to the external appearance of your lot?

Go deeper

General information only, not legal advice.