Fees, funds and insurance
Fees, lot liability and lot entitlement
How Victorian owners corporations split fees by lot liability, split insurance and voting power by lot entitlement, and when the benefit principle changes who pays.
4 min read · Last checked
On this pageTwo numbers, two different jobsOn this page
Unlike New South Wales, where one number (unit entitlement) drives almost everything, every Victorian Plan of Subdivision gives your lot two separate numbers: lot liability and lot entitlement. Confusing them is one of the most common mistakes committees and new owners make.
Two numbers, two different jobs
| Number on Plan of Subdivision | What it sets | Where the rule sits |
|---|---|---|
| Lot liability | Your share of annual general fees, maintenance fund fees and standard special fees | s 23(3) |
| Lot entitlement | Your share of building insurance premiums, your voting power on a poll, the 50% quorum fallback and the 25% threshold to call a special general meeting | s 23A, s 89(3), s 77, s 74 |
On many plans the two numbers are identical, so nobody notices the difference. On mixed-use, penthouse or townhouse plans they often diverge — for example, a ground-floor shop might have a lower lot liability (because it does not use the residential lifts) but a higher lot entitlement (because its floor area is worth more of the total building).
Test how a different lot liability and lot entitlement change your annual bill and voting weight:
Interactive Victorian Fee & Vote Split
Lot Liability pays the bills — Lot Entitlement weighs your vote
Your fee share (Lot Liability: 5.50%)
$1,513 / quarter
$6,050 per year
Your voting weight (Lot Entitlement)
4.00%
Used for polls, special resolutions and ownership share of common property—separate from your fee share.
The "benefit more, pay more" principle
General fees follow lot liability, but extraordinary expenditure does not have to. Three sections of the Owners Corporations Act 2006 let — and in some cases require — the owners corporation to depart from lot liability:
- Extraordinary repairs and works (s 24(2A)): Special fees for repairs, maintenance or other works that are undertaken wholly or substantially for the benefit of one or some lots must be levied on the basis that the lot owner who benefits more pays more.
- Particular use of a lot (s 24(2B)): The OC can levy a special fee on an individual owner for repairs or maintenance triggered by the particular use of that lot.
- Debt recovery for works (s 49): Where the OC carries out works (including on common property) wholly or substantially for the benefit of one or some lots, it can recover those costs as a debt from the benefiting owners.
In Owners Corporation PS407621Y v Grundl [2017] VCAT 1550, VCAT made clear that the benefit principle is not a licence for guesswork: the committee must follow a defensible, documented method when allocating uneven shares. And in Damjanovski v Owners Corporation 1 Plan No. PS503570D [2026] VSC 656, even after holding that balcony floor layers were common property, the Supreme Court noted that cost allocation under the benefit principle remains a live question where a balcony serves only one apartment.
Similarly, under s 53, upgrading works are levied by lot liability unless they wholly or substantially benefit only some lots.
Payment dates, penalty interest and banned "late fees"
The owners corporation sets the payment dates and instalment schedule (commonly quarterly) under s 23(4). If an owner pays late:
- Penalty interest requires a general meeting vote: Under s 29, the OC can only charge interest on overdue fees if authorised by resolution at a general meeting, capped at the maximum rate under the Penalty Interest Rates Act 1983.
- Waivers must be reported: Any decision to waive interest must be reported at the next AGM under s 71.
- No invented admin late fees: Consumer Affairs Victoria guidance is clear that an OC cannot tack on flat "$50 late payment fees" or arbitrary manager admin charges. Only statutory interest (if resolved) and reasonable recovery costs ordered by VCAT can be added.
Check your understanding
1. Which number on a Victorian Plan of Subdivision determines your share of annual general OC fees?
2. When can a Victorian OC charge penalty interest on overdue fees?
3. Under s 24(2A), how must extraordinary repair works that wholly or substantially benefit only two lots be levied?
Go deeper
General information only, not legal advice.