Fees, funds and insurance
Maintenance plans and the maintenance fund
Who must have a Victorian maintenance plan, what s 37 and reg 7 require it to list, how maintenance fund spending works, and how to separate plant from renovations.
5 min read · Last checked
On this pageWho must have a maintenance planOn this page
Every lift motor, roof membrane, hot-water boiler and external paint coat has a finite life. A maintenance plan is how a Victorian owners corporation prices those replacements ten years ahead instead of hitting owners with sudden five-figure special fees.
Who must have a maintenance plan
Under s 36 of the Owners Corporations Act 2006:
- Tier 1 (over 100 occupiable lots) and Tier 2 (51 to 100 lots): Mandatory. Developers must also provide an initial maintenance plan at the first meeting under s 67.
- Tiers 3, 4 and 5: Voluntary — though many Tier 3 blocks (10 to 50 lots) adopt one anyway to keep levies predictable and support resale value.
While the Act does not attach an automatic dollar fine if a Tier 1 or Tier 2 building fails to prepare a plan, any lot owner can apply to VCAT under s 165 for an order compelling the OC to prepare and approve one.
What the plan must contain
Under s 37 and the Owners Corporations Regulations 2018, a maintenance plan must list all major capital items expected to need repair or replacement within the next 10 years, including:
- Present condition of each item
- When the repair or replacement is expected
- Estimated cost of the work
- Expected life of the item once repaired or replaced
Section 37 explicitly names lifts, air conditioning plant and heating plant. The Regulations expand the list to common property structures (roofs, stairways, balustrades, window frames), services (shared water, gas and sewerage pipes, pumps, drains, electrical and telecoms cabling) and assets (fences, pools and water tanks).
The Act does not force you to hire a specific type of professional to draft the plan — Consumer Affairs Victoria publishes a free template — though an independent building consultant or quantity surveyor is well worth the cost in multi-storey buildings with lifts, basements or central plant.
Approval, funding and spending rules
- 1. Approve the plan (s 38)A draft plan has no legal effect until owners approve it by ordinary resolution.
- 2. Open and fund the account (ss 40, 42)Keep a dedicated maintenance fund in the OC's name, adequately funded through annual fees.
- 3. Report every AGM (s 39)Table an annual implementation report at every AGM; amend the plan by ordinary resolution (s 37(1A)).
- 4. Spend by the rules (ss 43–45)In the plan = ordinary resolution. Outside the plan = special resolution. Urgent safety = act now, report ASAP.
Look closely at the three spending gateways in the Act:
- Work listed in the approved plan (s 43): Only requires an ordinary resolution.
- Work NOT in the approved plan (s 44): Requires a special resolution (75% of all lots) before money can be drawn from the maintenance fund.
- Urgent safety or unforeseen repairs (s 45): Allowed without a special resolution, provided the OC reports the expenditure to lot owners as soon as practicable.
Under s 42, the money paid into the maintenance fund must be adequate to fund the approved maintenance plan (alongside interest earned and any insurance payouts for covered capital items). If the OC needs to borrow money instead, s 25 allows an ordinary resolution for loans up to the current annual fees, and requires a special resolution for larger loans.
Separating plant replacements from cosmetic upgrades
Committees often get tripped up by bundling cosmetic lobby makeovers into the maintenance plan alongside essential plant replacements. Under s 53, upgrading works that cost more than twice the annual fees (or require a building or planning permit) need a special resolution — unless they are already part of an approved maintenance plan or required repairs. And under s 52, any significant alteration to the use or appearance of common property also needs a special resolution.
Keep your maintenance plan focused on like-for-like repair and replacement of building plant and fabric over a 10-to-15-year horizon, and put optional cosmetic upgrades on their own separate AGM motion so owners can debate them cleanly.
Check your understanding
1. A Tier 2 building's consultant finishes a new maintenance plan, and the committee puts it in the filing cabinet without a vote. Is it legally in force?
2. Your building wants to draw $40,000 from the maintenance fund for a non-urgent courtyard redesign that is NOT listed in the approved maintenance plan. What vote is needed?
3. Which of these items are explicitly named in s 37(2) as major capital items for a Victorian maintenance plan?
Go deeper
General information only, not legal advice.