Committees & Records
How to Get Quotes and Run a Tender in Strata (Free Request-for-Quote Template)
When does strata law require more than one quote? NSW requires two for work over $30,000, Queensland requires two above the major spending limit, and WA and the NT have their own triggers. Here's who approves the spend, how to write a scope so quotes compare, the checks to run, and a free request-for-quote template.
By Buddy · · 13 min read

On this pageThe owner briefingOn this page
- The owner briefing
- Quick answers
- How many quotes does a strata committee need?
- What is the major spending limit in Queensland?
- Who approves contractor spending: the committee or the owners?
- Can a committee member's relative or company quote for the work?
- When the law requires more than one quote
- Who approves the spend
- Write the scope before you ask for a price
- Check licence, insurance and safety
- Conflicts of interest and related parties
- Compare quotes like for like
- Payment terms, retentions and variations
- Minute the decision
- Request-for-quote template
- Quote comparison table template
- Quote and approval rules by state
- Committee checklist
- How UnitBuddy fits
- Related reading
- Sources and further reading
The owner briefing
- Two states set a hard number. NSW owners corporations need at least two independent quotes for work over $30,000. Queensland bodies corporate need at least two above the major spending limit, which is $10,000 or less by default. WA and the NT tie quotes to specific approval steps.
- Before anyone asks for a price, check who can approve the spend. The committee's power usually ends at the budget or a dollar limit, and above that the owners decide at a general meeting.
- Quotes only compare if every contractor prices the same written scope. That scope, plus licence and insurance checks and a minuted decision, is what protects the building if the job goes wrong.
Most strata arguments about contractors aren't really about the contractor. They're about process. Who picked them? Did anyone else get a chance to quote? Was the committee allowed to spend that much? Does the chair's brother-in-law own the company? A short, boring tender process answers all four before anyone asks.
This guide pairs with our committee meeting agenda template and minutes template. The request for quote gets the prices in. The agenda puts the decision to a vote. The minutes record it.
Quick answers
How many quotes does a strata committee need?
It depends on the state and the amount. In NSW, the owners corporation must get at least two independent quotes for work over $30,000, whatever the size of the scheme (NSW Fair Trading; s 102). In Queensland, at least two quotes are needed for spending above the major spending limit (ss 173–174). Elsewhere, two or three quotes are good practice rather than a fixed rule, with the exceptions in the state table.
What is the major spending limit in Queensland?
Unless the body corporate sets its own amount at a general meeting, it's the lesser of $1,100 times the number of lots, or $10,000 (Schedule 1). Above it, owners must get at least 2 quotes with the meeting notice (s 173). If the committee decides the spend itself, it must get and consider at least 2 quotes first (s 174).
Who approves contractor spending: the committee or the owners?
The committee can approve spending within its power, which usually means within the adopted budget and under any dollar limit. Above that, the owners decide at a general meeting. In Queensland, the default committee limit is $200 times the number of lots (s 172). In WA, spending outside the approved budget is limited to $500 per lot unless another exception applies (s 102(6); reg 81). Our committee powers guide covers the rest.
Can a committee member's relative or company quote for the work?
Usually yes, but the member must declare the interest and stay out of the decision. NSW committee members disclose a pecuniary interest and leave the discussion and vote (Schedule 2, cl 18). Queensland voting members disclose and don't vote (s 66). WA council members disclose in writing and don't vote (s 137). In NSW, the two required quotes must also come from independent sources.
When the law requires more than one quote
NSW. Since the 2023 reforms, every owners corporation, not just large schemes, needs at least two independent quotes for work costing more than $30,000. NSW Fair Trading's guidance says "You will need at least two independent quotes for items more than $30,000" (NSW Fair Trading). The rule sits in s 102. Strata manager PICA's summary of the change adds three details: the $30,000 includes GST, emergency spending is excluded, and if the owners corporation can't get two quotes, the secretary must put an explanation on the next general meeting agenda (PICA). Don't split one job into smaller invoices to get under the line.
Queensland. Three numbers matter: the committee spending limit, the major spending limit, and the 2-quote rule.
- Above the committee spending limit, the spend needs an ordinary resolution of the body corporate, with a few exceptions such as emergencies, statutory orders and some insurance decisions (s 172).
- Separate proposals that make up one project count as one project (s 172(2)).
- For a general meeting motion above the major spending limit, owners get at least 2 quotes with the notice. Summaries are fine if the quotes are long, as long as owners are told where to read the full documents (s 173). Competing quotes go to the vote as a group of motions.
- The rule covers engaging a body corporate manager or service contractor too, and the cost includes any extension or renewal options. It doesn't apply to engaging a service contractor who is also, or will be, the letting agent (s 173(1), (9)).
- One quote is enough only for "exceptional reasons", such as goods available from a single source (s 173(6), s 174(5)).
- Quotes are kept with the minutes (s 173(8), s 174(6)).
These are Standard Module rules. Schemes under another module should check their own. Our Queensland self-managed guide has the full spending table.
WA. A strata company can't spend outside its approved budget except in set cases (s 102(6)). One is spending of up to $500 per lot a year (reg 81). Another is the objection procedure: owners get notice of the proposed spend and it goes ahead unless owners of 25% of lots or unit entitlement object within 14 days. That notice must include particulars of at least 2 separate quotes or tenders (reg 82).
NT. Under management modules 1 and 2, the body corporate can set a maximum the committee may spend on repairs or improvements to common property (cl 24). A general meeting notice for a resolution to spend above that amount must include 2 quotes (cl 32(2)(e)).
Victoria, SA, Tasmania and the ACT. I found no general statutory quote requirement in the Acts. Getting quotes is still good practice, and your scheme's rules, articles or a general meeting resolution may require it.
Who approves the spend
Settle this before you ask anyone for a price. A committee that gets three quotes for a $60,000 job it can't approve has wasted a month.
- NSW: the committee can't decide anything that needs a special or unanimous resolution (s 36(3)). Fair Trading says large schemes need owners corporation approval by majority vote for items more than 10% over the AGM estimate (NSW Fair Trading). Check your minutes for any spending limit the owners have set.
- Victoria: the committee holds the owners corporation's delegated powers, except those that need a unanimous or special resolution or a general meeting (s 11).
- Queensland: the committee spending limit and the restricted issues (s 172). A budget line isn't, by itself, approval to spend (s 160(7)).
- WA: the council acts subject to any restriction the owners impose by ordinary resolution (s 135), and the budget rules above apply.
- ACT: payments from the general fund must be in the approved budget or authorised by ordinary resolution (s 77).
- Tasmania: the committee acts subject to limits and directions set at a general meeting (s 79).
If the job is too big for the committee, the committee can still run the tender and put the quotes to a general meeting. That's usually the right move for capital works. The committee powers guide explains where the line falls.
Write the scope before you ask for a price
A quote is a price for what the contractor thinks you asked for. Send three contractors a vague email saying "the roof leaks" and you'll get three prices for three different jobs.
A usable scope of works says:
- What the problem is, with photos and any report you already have.
- What result you want, such as "membrane replaced on the level 6 balcony to stop water entering lot 52", not "fix the balcony".
- What's included: access, scaffolding, waste removal, making good, certificates and warranties.
- What's excluded, or what the building will supply.
- Site rules: working hours, lift protection, parking, keys, notice to residents.
- Standards and approvals the work must meet, if you know them.
- How to price it: a fixed lump sum, with any provisional sums and the daily rate for extra work shown separately.
For larger or technical jobs, such as facade, waterproofing, lifts and fire systems, pay a consultant to write the specification. An independent spec is also the easiest way to stop a contractor quoting for its own diagnosis. Our apartment running costs guide shows typical service contracts and where buildings overpay.
Check licence, insurance and safety
Do these checks before the quotes reach the committee, not after the contract is signed.
Licence. Look the business up on the state register, not the logo on the quote.
- NSW: a contractor licence is needed for residential building work over $5,000 including labour, materials and GST, and for electrical, plumbing, drainage, gasfitting and air-conditioning work at any price. Check it on NSW Licence Check.
- Queensland: a QBCC licence is generally needed for building work over $3,300, and for plumbing, drainage, gas fitting and fire protection at any price. Search the QBCC register.
- Victoria: domestic building work over $10,000 generally needs a registered builder. Check on the Building and Plumbing Commission register.
- Other states: use the building regulator's public register, and check the licence class covers this kind of work.
Insurance. Ask for certificates of currency, not policy summaries, and check the expiry date. You want public liability at the amount you set in the request, and workers compensation if the contractor has employees. For residential building work, ask whether home warranty insurance applies.
Safety. In NSW, an owners corporation responsible only for residential common areas generally isn't a "person conducting a business or undertaking" for those areas. That changes once it employs someone, such as a caretaker paid as an employee, and mixed-use common areas usually bring work health and safety laws in (SafeWork NSW). Contractors aren't employees, but the building still controls the site. Tell contractors about known hazards such as asbestos registers, roof access and anchor points, and ask for their safe work method statement for high-risk work. Victoria runs its own occupational health and safety law, so check WorkSafe Victoria there.
Conflicts of interest and related parties
A related-party quote isn't banned. A hidden one is the problem.
- NSW: a committee member with a pecuniary interest must disclose it and stay out of the discussion and vote. The disclosure is recorded (Schedule 2, cl 18).
- Victoria: committee members must act honestly, in good faith and in the owners corporation's interests, and must not use their position to gain an advantage for themselves or anyone else (s 117).
- Queensland: voting members disclose any direct or indirect interest and don't vote on it (s 66). Body corporate managers and caretakers must disclose associate relationships and commissions before the body corporate contracts (ss 154–156).
- WA: council members disclose in writing and don't vote (s 137).
- SA: a delegate with a pecuniary interest must disclose it in writing before acting (s 27D), and anyone voting at a meeting must disclose a pecuniary interest before the vote (s 34A).
- ACT: executive members must disclose any conflict of interest to the committee (Sch 1, Part 1.1, cl 8).
Strata managers are the other related party. Many have preferred contractors, and NSW Fair Trading says so in its own guidance. Ask in writing whether the manager or its staff get any commission, rebate or referral fee from any contractor on the list. Then read the answer against your agency agreement. Our guides to hidden fees in strata contracts and auditing your strata manager's commissions show where those payments sit.
Compare quotes like for like
Put every quote into one table before anyone looks at the bottom line. Line up scope, exclusions, provisional sums, start date, duration, warranty, payment terms, licence and insurance. Then compare price.
The cheapest quote is only the cheapest if it prices the same job. A $42,000 quote that leaves out scaffolding and waste removal isn't $6,000 cheaper than a $48,000 quote that includes them.
When quotes don't match the scope, go back to all bidders with the same written question and the same deadline. Don't let one bidder see another's price. If you rescope, re-quote everyone.
Payment terms, retentions and variations
The contract is where most of the risk sits, and committees often sign whatever the contractor sends.
- Deposits and progress payments. Pay against work completed, not against dates. Avoid large upfront payments.
- Retention. For bigger jobs, hold back part of each payment until defects are fixed, and say in the contract when it's released.
- Variations. No extra work without a written, priced variation approved by whoever approved the original spend. If variations push the total over the committee's limit or over a quote threshold, the approval steps apply again.
- Completion. List what the building gets at the end: compliance certificates, warranties, as-built drawings, and the paperwork the next contractor will need.
- Contract form. For residential building work over $20,000, NSW guidance suggests getting three quotes and using an extensive home building contract (NSW Government). In Queensland, building work over $3,300 must come with a contract (QBCC).
Minute the decision
Write the motion so the minutes show why this contractor got the job:
Attach or list every quote. In Queensland, quotes must be kept with the minutes (s 173(8)), and the minutes template has a place for them. Record any conflict declared and who left the room. If you accepted something other than the cheapest compliant quote, write one line saying why.
Request-for-quote template
Delete what doesn't fit the job. A gutter clean doesn't need clause 5. A facade repair needs all of it.
Quote comparison table template
The "comparable total" row is the one that matters. Price each bidder's exclusions so every column covers the same job.
Quote and approval rules by state
| State | Who approves | Quote rule | Conflict rule |
|---|---|---|---|
| NSW | Committee, except special or unanimous resolution matters (s 36(3)) | At least 2 independent quotes over $30,000, all schemes (s 102; Fair Trading) | Disclose, leave the discussion and vote (Sch 2, cl 18) |
| Vic | Committee under delegation, except special, unanimous or general meeting matters (s 11) | No general rule found in the Act. Good practice | Good faith; no improper use of position (s 117) |
| Qld | Committee up to $200 × lots by default; above that, the body corporate (s 172) | At least 2 quotes above the major spending limit, by default the lesser of $1,100 × lots or $10,000 (ss 173–174) | Disclose and don't vote (s 66) |
| WA | Council, subject to owner restrictions (s 135); unbudgeted spend capped at $500 per lot (s 102) | At least 2 quotes or tenders in an objection-procedure notice (reg 82) | Disclose in writing and don't vote (s 137) |
| SA | Management committee, if appointed (s 35) | No general rule found in the Act. Good practice | Disclose pecuniary interests (ss 27D, 34A) |
| Tas | Committee, subject to general meeting limits (s 79) | No general rule found in the Act. Good practice | Not set in the provisions I read. Set one in your rules |
| ACT | Payments in the approved budget or by ordinary resolution (s 77) | No general rule found in the Act. Good practice | Disclose to the executive committee (Sch 1, cl 8) |
| NT | Committee up to the limit the body corporate sets (cl 24) | 2 quotes with the notice for spending above that limit (cl 32) | Not covered here. Check the module |
SA community title schemes fall under the Community Titles Act 1996, which I haven't covered. In the NT, these rules are from modules 1 and 2 under the Unit Title Schemes Act 2009. Small schemes should check their own module.
Committee checklist
How UnitBuddy fits
In UnitBuddy, quotes, the scope and the contract sit in the building's documents beside the decision that approved them. The committee can see which contractors quoted, which one won and on what motion. When the job comes up again in five years, the next committee starts from the last tender instead of a blank email.
Related reading
- Work Health and Safety for Strata: When the Owners Corporation Has Duties to Contractors
- What strata committee members can and can't do
- Strata committee meeting minutes template
- The hidden fees in your strata contract
Sources and further reading
- NSW Fair Trading: Appointing strata managers and other workers
- NSW Government: Strata building repairs health check
- PICA: NSW December 2023 strata reforms fact sheet
- SafeWork NSW: Strata title and body corporate
- Queensland: Body Corporate and Community Management (Standard Module) Regulation 2020
- WA: Strata Titles (General) Regulations 2019
- NT: Unit Title Schemes (Management Modules) Regulations 2009
- ACT: Unit Titles (Management) Act 2011
What changed in strata this month? Read the strata news for your state, with every figure sourced.
More guides like this

Guides
Strata Committee Governance in Australia: A Plain-English Guide for 2026
How strata committees actually work in Australia: powers, limits, meetings, voting, removing members, and what the 2026 reforms have changed. State-by-state, written for committee members and owners, not strata managers.
5 May 2026 · 13 min read

Committees & Records
Mixed-Use Buildings: Building Management Committees, Strata Management Statements and Who Pays for Shared Facilities
When apartments sit above shops, offices or a commercial car park, one building can hold several owners corporations. A building management committee and a strata management statement decide who runs the shared lifts, plant and insurance, and who pays for them. This is how it works in NSW, how Victoria and Queensland do it, and what to check before you buy.
19 November 2026 · 13 min read

Committees & Records
NSW Initial Maintenance Schedule: What the Developer Must Hand Over and How to Check It
In NSW the developer must prepare the initial maintenance schedule on the standard form and give it to the owners corporation before the first AGM. Here is who prepares it, what it must contain, how it feeds the 10-year capital works fund plan and the building bond inspections, and how to check it line by line.
19 November 2026 · 13 min read