Levies, funds and insurance

The 10-year sinking fund forecast

How Queensland's rolling 10-year sinking fund forecast works under SM s 160(3), why a professional report is optional, annual reviews and challenging unreasonable levies.

4 min read · Last checked

Every Queensland building sits in subtropical heat, UV and summer storms that punish paint, roofs, waterproofing and lifts faster than owners expect. The 10-year sinking fund forecast is how a body corporate prices those capital replacements gradually instead of blindsiding owners with sudden special levies.

The rolling 10-year rule

Under of the , every annual sinking fund budget must raise enough money to cover:

  1. Anticipated capital spending in the current financial year, plus
  2. An appropriate share of anticipated major capital spending over at least the next 9 financial years (10 years total, rolling forward every single year).

For new developments, the original owner (developer) must hand over a detailed 10-year sinking fund estimate at the scheme's first AGM under .

How the forecast is prepared, reviewed and funded

  1. 1. Draft or update the 10-year forecastCommittee, owner or quantity surveyor updates expected costs and timing for roofs, painting, lifts, pools, driveways and plant.
  2. 2. Set the annual sinking fund budget (SM s 160)Proposed budget goes out with the 21-day AGM notice; AGM adopts it (may adjust ±10% under SM s 161).
  3. 3. Levy contributions by CSLE (SM s 162)Paid into the dedicated sinking fund account (never mixed with the admin fund).
  4. 4. Spend properly when works fall dueBudget adoption is not spending authority (SM s 160(7)) — get 2 quotes above the major spending limit.
Annual sinking fund forecast cycle in Queensland

Three practical points Queensland committees often miss

  • A professional quantity surveyor is optional: Queensland Government guidance confirms a body corporate does not legally have to pay a professional to write the sinking fund forecast — the committee or an owner can prepare it. That said, in mid-rise or high-rise buildings with lifts, basements or central chillers, an independent inspection every few years stops committees from under-pricing major plant by hundreds of thousands of dollars.
  • No fixed 5-year statutory review clock — it is reviewed every year: Unlike NSW (5-year statutory review), Queensland builds the review into every annual AGM budget because requires the rolling 9-year look-ahead each year.
  • Unreasonable levies can be challenged: If a committee deliberately starves the sinking fund to keep levies artificially low — or over-collects unreasonably — any lot owner can apply to a BCCM adjudicator to adjust the contributions under of the .

When a unit is sold under Queensland's Seller Disclosure regime (), buyers see the sinking fund balance on the Body Corporate Certificate and can inspect the full 10-year forecast under — so a healthy, realistic sinking fund directly protects resale prices.

Check your understanding

1. How far ahead must a Queensland Standard Module sinking fund budget plan under SM s 160(3)?

2. Does Queensland law force every body corporate to hire a professional quantity surveyor to prepare its sinking fund forecast?

3. What can a lot owner do if the body corporate votes for an unreasonably low (or unreasonably high) sinking fund contribution?

Go deeper

General information only, not legal advice.