Levies, funds and insurance
The 10-year sinking fund forecast
How Queensland's rolling 10-year sinking fund forecast works under SM s 160(3), why a professional report is optional, annual reviews and challenging unreasonable levies.
4 min read · Last checked
On this pageThe rolling 10-year ruleOn this page
Every Queensland building sits in subtropical heat, UV and summer storms that punish paint, roofs, waterproofing and lifts faster than owners expect. The 10-year sinking fund forecast is how a body corporate prices those capital replacements gradually instead of blindsiding owners with sudden special levies.
The rolling 10-year rule
Under SM s 160(3) of the Standard Module Regulation 2020, every annual sinking fund budget must raise enough money to cover:
- Anticipated capital spending in the current financial year, plus
- An appropriate share of anticipated major capital spending over at least the next 9 financial years (10 years total, rolling forward every single year).
For new developments, the original owner (developer) must hand over a detailed 10-year sinking fund estimate at the scheme's first AGM under SM s 96.
How the forecast is prepared, reviewed and funded
- 1. Draft or update the 10-year forecastCommittee, owner or quantity surveyor updates expected costs and timing for roofs, painting, lifts, pools, driveways and plant.
- 2. Set the annual sinking fund budget (SM s 160)Proposed budget goes out with the 21-day AGM notice; AGM adopts it (may adjust ±10% under SM s 161).
- 3. Levy contributions by CSLE (SM s 162)Paid into the dedicated sinking fund account (never mixed with the admin fund).
- 4. Spend properly when works fall dueBudget adoption is not spending authority (SM s 160(7)) — get 2 quotes above the major spending limit.
Three practical points Queensland committees often miss
- A professional quantity surveyor is optional: Queensland Government guidance confirms a body corporate does not legally have to pay a professional to write the sinking fund forecast — the committee or an owner can prepare it. That said, in mid-rise or high-rise buildings with lifts, basements or central chillers, an independent inspection every few years stops committees from under-pricing major plant by hundreds of thousands of dollars.
- No fixed 5-year statutory review clock — it is reviewed every year: Unlike NSW (5-year statutory review), Queensland builds the review into every annual AGM budget because SM s 160(3) requires the rolling 9-year look-ahead each year.
- Unreasonable levies can be challenged: If a committee deliberately starves the sinking fund to keep levies artificially low — or over-collects unreasonably — any lot owner can apply to a BCCM adjudicator to adjust the contributions under Schedule 5 of the Body Corporate and Community Management Act 1997.
When a unit is sold under Queensland's Seller Disclosure regime (Property Law Act 2023 s 99), buyers see the sinking fund balance on the Body Corporate Certificate and can inspect the full 10-year forecast under s 205 — so a healthy, realistic sinking fund directly protects resale prices.
Check your understanding
1. How far ahead must a Queensland Standard Module sinking fund budget plan under SM s 160(3)?
2. Does Queensland law force every body corporate to hire a professional quantity surveyor to prepare its sinking fund forecast?
3. What can a lot owner do if the body corporate votes for an unreasonably low (or unreasonably high) sinking fund contribution?
Go deeper
General information only, not legal advice.