When it goes wrong
Building defects, QBCC and Home Warranty
How the Queensland Home Warranty Scheme works (up to 3 storeys above a car park), strict 3-month notice and 6-year-6-month time limits, QBCC directions and cladding.
3 min read · Last checked
On this pageThe QBCC Home Warranty clocksOn this page
Queensland's Queensland Home Warranty Scheme, run by the Queensland Building and Construction Commission (QBCC), is one of the strongest consumer safety nets in Australia — it approved $55.7 million in claims and issued 1,374 Directions to Rectify in 2025–26 alone. But it has two sharp traps every Queensland committee must know: a 3-storey height cap and a 3-month notice deadline.
The QBCC Home Warranty clocks
- 3 months from discoveryStructural defect claims must generally be lodged within 3 months of first noticing the defect — do NOT sit on it.
- 6 months / 7 months (non-structural)Non-structural defects are covered for 6 months after substantial completion; claims due within 7 months.
- 6 years & 6 months (structural)Structural defect cover runs 6 years and 6 months from the earliest commencement date (may extend if build >6 months).
- 4+ storey buildings EXCLUDEDHome Warranty covers residential work >$3,300 only in buildings up to 3 storeys above a car park. Taller towers must pursue builder/QCAT/court claims.
Key rules for Queensland committees
- Who is covered: Subsequent unit owners and the body corporate are covered for insurable residential building work over $3,300 (including GST). A common property claim is apportioned across the lots by lot entitlement, with standard cover generally capped at $200,000 (unless optional extra cover was bought at contract signing).
- QBCC Directions to Rectify: Before or alongside a Home Warranty claim, the QBCC can inspect defective work and issue a legally binding Direction to Rectify against the licensed builder.
- Taller buildings (4+ storeys): Because towers above three storeys over a car park sit outside the Home Warranty Scheme, committees in newer mid-rise and high-rise Queensland buildings must commission an independent defect audit early and pursue unresolved disputes directly against the builder via QCAT or the courts (and remember starting non-levy legal proceedings requires a special resolution under s 312).
- Combustible cladding: Queensland ran the Combustible Cladding Checklist Scheme to audit affected buildings, but unlike Victoria's Cladding Safety Victoria or NSW's Project Remediate, remediation in Queensland is largely owner-funded — typically $15,000 to $50,000+ per lot, with heavy insurance loadings while unresolved.
Check your understanding
1. Which new multi-unit Queensland buildings are covered by the QBCC Queensland Home Warranty Scheme?
2. Once a Queensland committee first notices a structural defect covered by Home Warranty, how long does it generally have to lodge the claim with QBCC?
3. What resolution does a Queensland body corporate need under s 312 before commencing court or QCAT defect proceedings against a builder?
Go deeper
General information only, not legal advice.